westwood

General Contractor in Valley Village

Call Now (310) 930-6258

Why Building in Valley Village Is Different

On a large lot, the floor area limit is theoretical. On a Valley Village lot it is usually the thing that defines your project. Owners here regularly find out at plan check that the addition they designed is bigger than the code allows, and by then they have paid for drawings twice. The answer is not clever design. It is doing the arithmetic in the first week, then designing to the number. That is also why interior reconfiguration and quality finishes deliver more here than square footage does.

We Do the Arithmetic First

Allowable floor area, setbacks, height limits and lot coverage calculated at the start. On a small lot this is not a formality, it is the shape of your entire project.

More House Without More Square Feet

Removing the right wall, reworking a hallway or building proper storage often delivers what an addition would, without touching the floor area cap. We will say so when it is true.

Postwar Systems Assessed Honestly

Original plumbing, undersized panels and no meaningful insulation are the norm in this housing stock. We look before we quote, so the infrastructure work is in the number you agreed to.

Small Sites, Managed Tightly

Narrow lots, close neighbors, street parking that everyone needs. Staging, deliveries and cleanup are planned rather than improvised.

Services Background

Recent Work In and Around Westwood

These are our own permitted, built and inspected projects. Several are within a short drive of our Westwood Boulevard office, and we are happy to show you one in person before you sign anything.

Valley Village Remodeling Questions, Answered

Straight answers about permits, design review, timelines and what the city actually requires.

1. How big an addition can I build on my lot?

Los Angeles limits the floor area of a single family house relative to its lot size, and on the smaller lots common in Valley Village that ceiling is often lower than owners expect. There is a specific number for your address. Getting it in week one is the difference between one set of drawings and two.

2. What if my house is already at or over the limit?

It happens, particularly where a previous owner added on. Existing nonconforming floor area limits what you can add, and the answer is usually to reconfigure rather than expand. That is not a consolation prize. It is often the better project.

3. Do I need a permit to remodel a kitchen or bathroom?

Yes for anything beyond finishes. Moving plumbing, adding circuits, altering framing and changing ventilation all require an LADBS permit.

4. Can I remove a wall to open up the kitchen?

Usually, with an engineered beam and a permit if the wall carries load. This is the most common Valley Village project we do and the one with the biggest visible payoff.

5. Can I convert my garage into living space?

It is a permitted alteration involving foundation, insulation, egress and electrical work. Note that converted space typically counts toward your floor area allowance, so it can affect what you are able to add later. Worth thinking about in sequence.

6. My house has original plumbing. Should I replace it?

If you are opening walls anyway, that is the moment. Old galvanized supply lines lose flow as they corrode internally, and replacing them after tile is installed costs several times more.

7. How long does an LADBS permit take?

Interior remodels move faster than additions. We give you a schedule that includes plan check time rather than only construction weeks.

8. What does a Valley Village remodel cost?

Finish level drives part of it, and what the house needs underneath drives the rest. In this housing stock, that is often plumbing, panel and insulation. We estimate line by line after a site visit.

Need help? Talk to our expert.

Talk to our experts or Browse through more.

Call Now (310) 930-6258