westwood

General Contractor in Tarzana

Call Now (310) 930-6258

Why Building in Tarzana Is Different

The typical Tarzana house has good bones, a small closed kitchen, one undersized bathroom for the whole family and a wall in exactly the wrong place. Taking that wall out is the project, and it is a structural alteration that needs a beam, a calculation, a permit and an inspection. Done properly it is the best money spent in this neighborhood. Done without a permit it becomes a problem at resale and a liability in an earthquake. We do it the first way.

We Engineer Before We Demolish

Removing a load bearing wall needs a structural engineer, a beam design and a permit. We arrange all three before a sledgehammer appears, and we tell you honestly when a wall cannot come out.

Postwar Systems Assessed Up Front

Original galvanized supply lines, aluminum branch wiring in some eras, undersized panels and no insulation to speak of. We inspect before we quote, so infrastructure is in the estimate rather than in a change order.

Built for Valley Heat

Insulation, ducting and equipment are sized for hundred degree summers. In a single story house with a large roof area, the attic is where most of your comfort and most of your utility bill is decided.

One Team Through LADBS

Application, corrections, resubmittals and inspections handled end to end. You never have to speak to a plan checker.

Services Background
Icon

Our Services in Tarzana

Kitchens, bathrooms, floor plan changes and exteriors across Tarzana, north and south of Ventura Boulevard.

Tarzana Remodeling Questions, Answered

Straight answers about permits, design review, timelines and what the city actually requires.

1. Can I take out the wall between my kitchen and living room?

Usually yes, but it depends on whether it carries load. If it does, you need a structural engineer to design a beam and posts, and you need an LADBS permit and inspection. Anyone who offers to do it without engineering and a permit is offering to create a problem you will pay for later.

2. Do I need a permit for a kitchen or bathroom remodel?

Yes for anything past finish work. Moving plumbing, adding circuits, altering framing and changing ventilation all require a permit. Painting and flooring generally do not.

3. My house has old galvanized pipes. Do I have to replace them?

Not always all at once, but if you are opening walls anyway, that is when it is cheapest to do. Galvanized supply lines corrode from the inside and lose flow. Replacing them after the tile is on costs several times what it costs while the wall is open.

4. Is it cheaper to add on or to reconfigure what I have?

In Tarzana, reconfiguring usually wins. You get the function of a larger house without foundation, roofing and exterior work, and without the floor area and setback analysis that an addition requires. We will tell you honestly which one your house needs.

5. Am I on a hillside lot?

If you are south of Ventura, possibly. It is a mapped designation and it changes how much floor area you are allowed and how much grading you can do. We check the parcel record before quoting.

6. Can I convert my garage?

Yes, and it is a permitted alteration involving foundation, insulation, egress and often electrical work. Done without a permit it reliably surfaces at resale.

7. How long will my remodel take?

A kitchen or bathroom is measured in weeks once permits are issued. Getting the permit is the part people underestimate, especially when structural work is involved. We give you both halves of the timeline.

8. What does a Tarzana remodel cost?

Finish level drives part of it. The rest is what your house needs underneath, and in postwar Tarzana that is often plumbing, electrical or insulation. We estimate line by line after a site visit.

Need help? Talk to our expert.

Talk to our experts or Browse through more.

Call Now (310) 930-6258